Need help or advice? Please feel free to call us at 01268 655977

Diamond Build PLC

The project involved the complete replacement of roofs to over 200 council owned properties. The job involved upgrading thermal insulation, new fascias, soffits & gutters, asbestos removal, new roof coverings and all associated works. Each property required LABC sign-off and this was carried out under the Competent Roofer Scheme.

Challenges

  1. Locations: Various addresses across the borough of Southend we to be replaced meaning that multiple welfare and compounds would be required.
  2. Weather Conditions: The replacement needed to be year-round and to a strict program meaning weather and other unforeseen issues were to be worked in to the program. This was especially challenging during the winter months.
  3. Existing Occupied Property: The existing properties were to remain occupied during the works. This meant that at any one time we were working on multiple properties, each with their own tenant types, including vulnerable people, children, pets, visitors and passers-by. It was also crucial that there was no damage caused as a result of our works.
  4. Supervision: Across multiple “mini-sites” supervision is challenging and rules needed to be established to ensure that the works would be completed safely & to a high standard.

Solutions Implemented

  1. Material Deliveries: All materials required to undertake the works needed to be delivered to multiple properties and ensure that they were not left in places that cause issues. This was undertaken by utilising small truck deliveries and taking materials directly to the roof via a ladder hoist.
  2. Project Execution:
    • Suitable scaffold was erected to undertake the works with additions to the scaffold as required to protect those below such as netting, sheeting and fanlight over doorways.
    • In order to ensure that the properties remained water-tight throughout the works, all stripped areas were re-covered on the same day with roof underlay. Roofline and insulation was undertaken at this stage.
    • A Resident Liaison Officer (RLO) was appointed to ensure that all residents were kept informed both in writing and with regular visits by the RLO.
    • Basic welfare facilities were set up in each location with a Central Site Office and compound to ensure that regular meetings would be concise and organised.
  3. Environmental Considerations:
    • All waste was sorted as appropriate to ensure that waste was recycled where possible. Old Lead flashings were taken to scrap for recycling and where possible old roof tiles were taken to reclaim.

Outcomes

  • Enhanced Durability: The council have upgraded a significant amount of stock and as a result these now have Local Authority Building Control Certificated roofs & Guarantees if needed.
  • Improved Energy Efficiency: The added insulation will reduce heating costs and provide a benefit to the environment.
  • Aesthetic Upgrade: The homes now look much newer and ensure that the local area as a whole retains its overall value.

Client Feedback

Walter Reed (Diamond Build) “We have been working with Seeco on this contract and the many before it for the last 13 years and are extremely happy with their ability to be able to take on all aspect of the work”

Conclusion

The fact that we began working with Diamond Build PLC 13 years ago on these works and have continued through each new tender stage to carry on shows that, not only did we provide a good service, that ensured our continued use, we were also pivotal in Diamond Build retaining the trust of the client for such a long period.

Latest

More case studies

memberships & certifications